Introduction to PACS and SACS Establishment

Geopro regularly establishes permanent airport geodetic control (Primary and Secondary Airport Control Stations). This type of work is both very specialized and physically demanding! A typical project takes about six months to complete and requires coordination with...

A tiny, volcanic island in eastern Indonesia.

Geopro spent last week at zero degrees latitude on the opposite side of the planet! Another successful project in Asia, and our third in Indonesia. The project was performed to document the existing runway and obstacle conditions to support procedure development and...